Sunday, April 28, 2013

Pin Placement/Cup Changing

As putting green speeds have increased over the years, so have the debates of the "fairness" of hole locations.  Golf courses periodically move hole locations on putting greens to spread out wear, in the hope of achieving a more uniform putting surface.  In a tournament situation, hole locations are changed to provide a different challenge to players in the tournament. 
During a typical week at Galen Hall, cups will be changed 2-5 times per week depending on volume of play.  If a tournament is scheduled, we will change hole locations after each round of the tournament.  During the golf season hole locations may change 140 -180 times per year.
When multiplied by eighteen holes, there will be over 3,000 different hole locations used.
We WILL make mistakes.
Under normal play, we set the golf course up to coincide with provided weather conditions.  We try to keep traffic away from dry spots, and during rainy periods we try to keep pins away from wet (low) spots.
During tournament conditions, we try to provide varying degrees of challenge based on history, and the type of tournament being played.
Holes will never be changed for the sake of providing a different "look" to every player on a daily basis.  I have worked at numerous golf clubs, and have never seen this practice used.
When there is a pin that you believe to be unfair, please notify me or the pro shop of the specific hole and date.  Without specifics, no remedy can be made.
It will always be my goal to provide challenging, but fair hole locations to our members .  I would also remind our players that Galen Hall's total green surface area is about half as compared to previous clubs' that I have maintained, which essentially provides half of the available hole locations as most courses have.
Our greens are 100 years old, and are very small and undulating by today's standards, but these challenging targets, and undulations are in my opinion, the backbone of this golf course.
If you ever have any comments or concerns I can ALWAYS be reached by email at: superintendent@galenhallgc.com.  My department phone number is (717) 484-2523.

Cold Weather = Bumpy Putting Greens

I think its safe to say that last spring's weather was preferable to most than the temperatures we've experienced so far this spring. 
Our greens are composed of two species of turfgrass.  The primary species is Creeping Bentgrass (Agrostis Stolinifera).  The secondary species is Annual Bluegrass (Poa Annua).  The two species concurrently occupy almost every putting green in the United States, if not the world.  During 90 percent of the golf season, the two species coexist very well.  The Annual Bluegrass grows very upright, and the Creeping Bentgrass grows laterally, which is why they compliment each other well.  Both tolerate the low mowing heights of which putting greens are maintained. 
This is the problem: 1.  Creeping Bentgrass is a perennial plant.  This means that it lives an essentially long life.  It does not die in the winter.  It can be equated to a tree or the grass in your lawn. (2) Annual Bluegrass is an annual plant, which essentially means that it lives one season, produces a seed, then dies.  It can be equated to a Marigold, or any plant in your vegetable garden.
As soil temperatures warm up in the spring, the two species resemble "the tortoise and the hare".  The Bentgrass is slow and steady, while the Poa is quicker, but erratic.  The Poa is affected much more than the Bentgrass by the cold weather once things get going.  The Bentgrass keeps growing.  The Poa shuts down.
Which, after this week has created the bumpy conditions on some of our greens. Overnight air temperatures have dipped into the 30's recently, and there was a frost on three nights last week.  We also had a frost on Friday night this week (April  26-27th).
It is hard for me as well as our members to remain patient, and let the warmer temperatures prevail.  As the nighttime temps come up, the greens surfaces will level out.
I apologize for the bumpy conditions of the putting greens, but I assure you that the conditions are very temporary, and will not persist.
Greens are also scheduled for aeration on 4/30 and 5/1.  This process will further smooth the greens as well.    

Thursday, April 18, 2013

Spring cleanup

After hours of raking, and countless loads of debris have been removed from the course, our spring cleanup process is coming to an end.  We have been able to refocus on completing unfinished projects that have lingered from the fall.  The mounding installed around the thirteenth tee has been seeded, along with the cleared area left of twelve green.
On the fifteenth hole, an approach is being added, complete with extra irrigation to improve the turf quality of the approach and green surrounds.  Improving the turf around fifteen green is a major priority for my department.
Numerous drainage projects have been completed on the sixth hole, and the back filled areas have been seeded.  As many may know, there is extensive drainage installed on the sixth hole, and it takes many man hours to keep the drains flowing properly. 
As you make your way around the course, you will notice white markings around tees and along fairway edges.  We have begun the process of re-contouring fairway and tee edges.  
Some of the areas maintained as tee surfaces have expanded over the years to include unusable slopes, and are being unnecessarily maintained. The edges are also being squared off for a more formal appearance.  Fairway edges are being tweaked to contour around trees, and undulation. Some landing areas have been expanded as well.  Overall there will be very little change to the total area of the tees and fairways.  
I know certain holes are looking uncharacteristically unkept due to the construction projects being completed.  My staff and I are excited to see this work come to fruition, and I hope our members are as well.  

Welcome to the new Galen Hall Golf Club Maintenance Blog

 Hello all!
I have created this blog to keep Galen Hall's members, guests and other customers informed of the maintenance activities taking place on the golf course. As the season progresses, I will post our current and planned projects and other scheduled practices to help make everyone more aware of what's happening on the course.
Thanks,
Chad